From decision to commissioning in one quarter.
The same Tier-1 hardware that powers utility-scale projects, sized for your facility — with all logistics, customs, and warranty wrapped in. No EMS lock-in. No procurement overhead.
Start project intakeWhy C&I buyers stop comparing OEMs.
Pre-integrated UL9540
Factory-integrated systems mean minimal site work, faster commissioning, predictable insurance — without bespoke engineering on your end.
EMS interoperability
Open APIs (Modbus, BACnet, REST) keep your existing energy management stack in control. No vendor lock-in disguised as a feature.
Right-sized, fast
Peak shaving, demand response, and behind-the-meter solar firming each cycle differently. We match hardware to use case, not the other way around.
Six months to operational
Six-month DDP collapses procurement into a single quarter. Decision in Q1, savings in Q2.
Delivered Duty Paid.
To your foundation.
From manufacturing allocation to final site placement, we manage all shipping, multi-jurisdictional customs, and tax liabilities. You pour the pad; we drop the system.
Comprehensive coverage.
Zero capex surprises.
A storage system is only as viable as its degradation curve. Ten years of hardware and performance coverage are baked into the unit price. Performance guarantee: 69.7% SoH at 8,000 cycles or 10 years.
Active architecture
Current default specification
System
Performance
Environment & enclosure
Safety & fire
Certifications
Control & integration
Specifications represent the baseline architecture currently procured via BESS Integrator. Project-specific configurations may yield variations within the selected OEM capability matrix.